Every extension conversation starts in the same place, and it is not the design. It is what is this going to cost me? — and the honest answer is that anyone who gives you a firm figure before seeing the house is guessing.
That is not a dodge. It is the single most useful thing we can tell you, because the range of legitimate answers is enormous and almost all of the variation comes from things you cannot see in a photograph. What we can do is show you the published research, be straight about its limits, and then explain exactly which local factors push a Penarth, Barry or Cardiff job up or down within it.
On this page The published figures · Why there is no Welsh figure · What moves the number here · The VAT rule
The published figures, and who published them
The most widely cited independent source is the HomeOwners Alliance, which publishes cost guidance for house extensions across the UK. Here are their 2026 rates per square metre, drawn to scale:
For whole jobs rather than rates, the same guidance gives:
| Single-storey extension size | Published cost |
|---|---|
| 20m² | £40,000 – £56,000 |
| 30m² | £60,000 – £84,000 |
| 50m² | £100,000 – £140,000 |
Those are the HomeOwners Alliance’s numbers, not ours. We are reproducing them because they are the clearest independent starting point available, and because the two-storey line surprises people every time: going up as well as out is usually cheaper per square metre than going out alone, since you are already paying for the foundations, the roof and the site setup.
Why there is no Welsh figure — and be suspicious of anyone who quotes one
Here is the part that most cost guides skate over. The HomeOwners Alliance notes that extension costs in London and the south east run higher than in the north, the midlands, and in Wales and Scotland — but it does not publish a Wales figure. Nor does anyone else, reliably.
So when a website confidently tells you an extension in Cardiff costs a specific amount per square metre, that number has almost certainly been derived by applying a guessed regional discount to an English average. It is not research. We would rather tell you the national range is your ballpark, tell you Wales generally sits at the lower end of it, and then quote your actual house.
What actually moves the number around here
In our experience across Penarth, Barry, Cardiff, Caerphilly and Pontypridd, the same five things account for most of the spread between two superficially identical extensions.
1. Whether you need planning permission at all
This is the biggest single lever, and it is a rules question rather than a building one. If your extension fits inside permitted development you save the application fee, the drawings that go with it, and — more importantly — the weeks. In Wales that means a single-storey rear extension of no more than 4m beyond the original rear wall and no more than 4m high.
Note what is not on that diagram: the 6m and 8m figures that dominate UK search results. Those come from England’s Larger Home Extension prior approval scheme, and Wales has no equivalent. If a budget has been built around a 6m extension going through without full planning permission, that budget is wrong in both money and time.
2. Whether the house is in a conservation area
Central Penarth, the enlarged Pontypridd town centre boundary, parts of Caerphilly and a good deal of Cardiff sit inside conservation areas. Inside one, side extensions, two-storey rear extensions and any roof extension all lose permitted development rights. That does not make them impossible — it makes them an application, with the design and professional fees that come with it, and often material specifications that cost more than the standard.
3. Access
A dock-era terrace in Cadoxton with no rear access is a fundamentally different job from a post-war semi in Bedwas with a driveway to the back gate. If every barrow of muck out and every pack of blocks in has to travel through the house, that is labour, protection and time, on every single day of the build.
4. Ground and levels
On the valley sides around Pontypridd and Caerphilly, the back of a house can sit a full storey below the front. Level changes drive retaining structures, longer drainage runs and awkward access, and all of those are decided at foundation stage. A flat-site price applied to a sloping plot is not a quote, it is an opening bid.
5. What you specify
The structure is the structure. Almost the entire spread between the bottom and the top of the published range is glazing, roof lights, floor finishes, heating and kitchen — two identical shells can differ enormously on what goes inside them. That is why we price the specification separately from the build, so you can see what you are actually choosing rather than being handed one number.
The VAT rule worth checking before you budget
Most building work is charged at the standard 20% VAT rate. There are two situations where it drops to 5%, and both are set out in HMRC’s VAT Notice 708:
The catch, and it is the one people get wrong: the reduced rate never applies to an extension or enlargement, however long the property has stood empty. Section 8.1.1 of the notice is explicit about it. The 5% rate is for renovating what is already there, or for changing how many dwellings the building contains — a house into flats, or several units back into one.
If you have bought somewhere that has genuinely been empty for two years or more, that is worth raising with us and with your accountant at the quoting stage rather than after. On a full renovation the difference between 20% and 5% is real money, and the evidence (Electoral Roll, Council Tax records, or the council’s empty property officer) is easier to gather before work starts.
What we do instead of a price list
We visit, we measure, we look at the access and the ground, and we tell you what the rules allow on your specific address before anyone draws anything. The quote separates structure from specification so you can see which parts are fixed and which are choices. Consultations and estimates are free and carry no obligation.
If the honest answer is that your idea does not work within permitted development and a full application is the sensible route, we will say that at the first visit rather than three weeks in.