Wrap around extension build

More Space Without Leaving Caerphilly.

Caerphilly's mix of housing gives extensions huge potential: the 1930s semis with generous side gardens are ideal for double-storey side extensions, the valley terraces suit full-width rear kitchen extensions, and the newer estates often have corner plots crying out for a wrap-around. We build across the whole borough — Caerphilly town, Bedwas, Llanbradach, Ystrad Mynach and beyond.

Planning here goes through Caerphilly County Borough Council, and we manage the whole application for you — drawings, submissions and building control sign-off. Many single-storey rear extensions fall under permitted development, which we'll confirm before you spend a penny on plans. See our work in Caerphilly or all our extension services.

Semi with a side garden?

That strip of grass beside a 1930s semi is the cheapest building plot you'll ever own. A double-storey side extension can add a garage, a bedroom and an en-suite — often adding more value than it costs.

Request a Free Quote All Extension Services

Popular Extension Types in Caerphilly

Double storey side extension on a semi

Double Storey Extensions

The best-value move for Caerphilly's semi-detached homes: build sideways over the drive or garden strip and gain two floors of space for one roof and one set of foundations.

Wrap around extension on a corner plot

Wrap-Around Extensions

Corner plots and L-shaped gardens on the borough's newer estates suit a wrap-around — combining rear and side extensions into one big open-plan family space.

Rear kitchen extension on a terrace

Rear Extensions

On valley terraces, a full-width rear extension replaces the cramped galley kitchen and outrigger with one wide, light kitchen-diner running the width of the house.

What our customers say

Reviews from real customers

Our reviews are published on Google, where you can read them in full and check they are genuine.

CONTACT US

Talk to us about your extension

Tell us the address and roughly what you have in mind, and we will come and look before we talk numbers. Ground conditions, drainage runs and access for machinery are what move an extension price — and none of them can be judged from a form.

Head Office (Penarth)

11a Royal Buildings, Stanwell Road
Penarth, CF64 3ED
info@allaspectsconstruction.co.uk
02920 036 677
Nick (Direct): 07519 377053

Work out a budget first

Our extension cost estimator gives an indicative range in about thirty seconds, with nothing to fill in.

Get In Touch

Proudly Partnering With

Extending in Caerphilly: ground, slope and the coalfield

Caerphilly extensions differ from coastal ones for two reasons that have nothing to do with design: much of the borough is on the old coalfield, and a great deal of it is on a slope. Neither stops a project. Both belong in the programme at week one.

Start with the myth, because it costs people money. Much of the borough falls inside a Development High Risk Area, where most planning applications require a Coal Mining Risk Assessment. Householder development is exempt. An extension or a loft conversion is exempt by type of application, high risk area or not.

What a homeowner on the old coalfield actually needs Householder development such as a house extension is exempt from the Coal Mining Risk Assessment requirement, even inside a Development High Risk Area. A separate permit from the Mining Remediation Authority, formerly the Coal Authority, is required only where ground works would disturb coal seams, abandoned workings or mine entries, and takes 20 or more working days. Extending on the old coalfield: what you need, and what you don’t Your home is in a Development High Risk Area Is it householder development — an extension, a loft? yes No Coal Mining Risk Assessment needed householder applications are exempt by type A SEPARATE QUESTION Will the ground works disturb workings, seams or a mine entry? yes — piling, drilling, grouting Mining Remediation Authority permit required standard applications take 20+ working days — build it into the programme, not the panic The Coal Authority was renamed the Mining Remediation Authority. Most trade sites still use the old name. Sources: GOV.UK planning applications and Coal Mining Risk Assessments; GOV.UK permits to deal with coal or coal mines.

Two different questions get muddled constantly. Planning does not ask a homeowner for a mining risk assessment. The permit is about physically disturbing old workings, and it is the one with a lead time worth planning around.

What is real is the separate permit. If the ground works would disturb coal seams, abandoned workings or a mine entry — piling, deep trenching, drilling, grouting — the Mining Remediation Authority (the renamed Coal Authority) must permit it, and a standard application takes 20 or more working days. That is a genuine month, and it is the most common reason a Caerphilly build slips.

Slope changes the foundations, not the finish

Level changes across a plot drive retaining structures, longer drainage runs and access arrangements. All three are foundation-stage decisions. A price built on a flat-site assumption and adjusted later is not a quote, and we would rather survey the levels before putting a number on it.

The ordinary Welsh limits still apply on top: 4m beyond the original rear wall for a single-storey rear extension, 4m in height, and no English 6m prior approval route. Caerphilly County Borough Council also has 16 conservation areas — inside one, side and two-storey rear extensions lose permitted development entirely. Conservation & Design: 01495 235235.

Your questions answered

Do I need a Coal Mining Risk Assessment for an extension in Caerphilly?

No. Householder development is exempt by type of application, even inside a Development High Risk Area. The requirement applies to most other kinds of planning application, which is why so much online guidance reads as though it applies to everyone.

Is there anything mining-related I do need?

Possibly a permit from the Mining Remediation Authority, but only if the ground works would enter or disturb coal seams, abandoned workings or a mine entry — piling, drilling, deep trenching or grouting. Standard applications take 20 or more working days, so it belongs in the programme from the start.

Does a sloping plot cost more?

It moves cost towards retaining, drainage and access rather than automatically increasing the total. What it does mean is that a flat-site quote is meaningless on a hillside plot — we survey levels before pricing.